Abdollahipour, S, Jeong, D H S, Burman, R R and Gunsaulis, F (2012) Performance Assessment of On-Grade Horizontal Directional Drilling. Journal of Construction Engineering and Management, 138(03), 458–68.

Anastasopoulos, P C, Labi, S, Bhargava, A and Mannering, F L (2012) Empirical Assessment of the Likelihood and Duration of Highway Project Time Delays. Journal of Construction Engineering and Management, 138(03), 390–8.

Becerik-Gerber, B, Jazizadeh, F, Li, N and Calis, G (2012) Application Areas and Data Requirements for BIM-Enabled Facilities Management. Journal of Construction Engineering and Management, 138(03), 431–42.

Chi, S and Caldas, C H (2012) Image-Based Safety Assessment: Automated Spatial Safety Risk Identification of Earthmoving and Surface Mining Activities. Journal of Construction Engineering and Management, 138(03), 341–51.

Choi, K, Kwak, Y H, Pyeon, J and Son, K (2012) Schedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement Projects. Journal of Construction Engineering and Management, 138(03), 323–30.

Hanna, A S (2012) Using the Earned Value Management System to Improve Electrical Project Control. Journal of Construction Engineering and Management, 138(03), 449–57.

Jain, K K and Bhattacharjee, B (2012) Application of Fuzzy Concepts to the Visual Assessment of Deteriorating Reinforced Concrete Structures. Journal of Construction Engineering and Management, 138(03), 399–408.

Kim, B, Lim, H, Kim, H and Hong, T (2012) Determining the Value of Governmental Subsidies for the Installation of Clean Energy Systems Using Real Options. Journal of Construction Engineering and Management, 138(03), 422–30.

Lee, D, Lim, T and Arditi, D (2012) Stochastic Project Financing Analysis System for Construction. Journal of Construction Engineering and Management, 138(03), 376–89.

Lim, B T H, Ling, F Y Y, Ibbs, C W, Raphael, B and Ofori, G (2012) Mathematical Models for Predicting Organizational Flexibility of Construction Firms in Singapore. Journal of Construction Engineering and Management, 138(03), 361–75.

Love, P E D, Edwards, D J, Irani, Z and Sharif, A (2012) Participatory Action Research Approach to Public Sector Procurement Selection. Journal of Construction Engineering and Management, 138(03), 311–22.

Subramanyan, H, Sawant, P H and Bhatt, V (2012) Construction Project Risk Assessment: Development of Model Based on Investigation of Opinion of Construction Project Experts from India. Journal of Construction Engineering and Management, 138(03), 409–21.

Tan, Y, Shen, L and Langston, C (2012) Competition Environment, Strategy, and Performance in the Hong Kong Construction Industry. Journal of Construction Engineering and Management, 138(03), 352–60.

Townsend, K, Lingard, H, Bradley, L and Brown, K (2012) Complicated Working Time Arrangements: Construction Industry Case Study. Journal of Construction Engineering and Management, 138(03), 443–8.

  • Type: Journal Article
  • Keywords: Construction industry; Australia; Case studies; Working conditions; Time factors; Work time; Work-life balance; Australia; Case study;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000436
  • Abstract:
    This paper extends the understanding of working-time changes and work-life balance (WLB) through analyzing a case study where a reduction in working hours designed to assist the workforce in balancing work and nonwork life was implemented. An alliance project in the Australian construction industry was established initially with a 5-day working week, a departure from the industry-standard 6-day week. However, a range of factors complicated the success of this initiative, and the industry-standard 6-day working week was reinstated for the project. The authors argue that this case is valuable in determining the complex mix of influences that work against a wholesale or straightforward adoption of working-time adjustments and work-life balance practices. It is concluded that although the prevailing workplace culture is considered an important factor in the determination of working time, structural and workplace principles and practices may also be critical in working to secure the successful introduction of working-time reduction and work-life balance initiatives in the construction industry in the future.

Yiu, T W, Cheung, S O and Siu, L Y (2012) Application of Bandura’s Self-Efficacy Theory to Examining the Choice of Tactics in Construction Dispute Negotiation. Journal of Construction Engineering and Management, 138(03), 331–40.